CLIENT | PROJECT TYPE | PROJECT DESCRIPTION | YEAR | STATUS |
MINISTRY OF FINANCE | HV & LV Testing | Testing of Main Distributor Panels & all other Panels for L.V. & H.V. testing on Transformers & Cables. | 2017 | Completed |
MINISTRY OF FINANCE | Emergence Electrical Work | Supply & Change Breaker, Test Power Cables, Replace damaged Cables | 2017 | Completed |
POWERGEN | Electrical Works | Supply & Install High-bay LED Lights for E&I Workshop | 2016 | Completed |
UNILEVER | Electrical Works | Material & Labour Waste Water Treatment Plant | 2016 | Completed |
UNILEVER | LV Testing | Joint Resistance Ductor Test, Insulation Resistance Test, Bot Resistance Test, Switchgear Contact Resistance Test, Inpection & Cleaning Main Panel Board | 2016 | Completed |
MINISTRY OF FINANCE | Servicing of Panels | (44) Panels to service & clean. Remove all unused Cables. Tighten all loose connections. | 2016 | Completed |
UNILEVER | Electrical Upgrade - Instrument Lab | Removal of existing Panel & Installation of new Panel, Supply & Install New Main Cable, UPS. Removal of 220v Plug & Installtion of new Plug, Breakers Trunking | 2016 | Completed |
UNILEVER | Electrical Work - Forklift Charging Bay | Supply & Install Cable, cable Tray (Fitting & Accessories), Circuit Panel & all fitting. Transformer, High-bay Lights, LED Emergency Light with Exit Signs | 2016 | Completed |
UNILEVER | Electrical Interfenece Removal - Tower Upgrade | Install & Secure Support Cable Tray, CableS. Disconnect old Cables from Circuit Breaker & Junction Box | 2016 | Completed |
POWERGEN | Installation of Transformer | Install Plinth & Neutral Grounding Resistor. Excavate & Install PVC conduit. Supply & Install HV Cable & bare-standard Cables. Built corrosion resistant perforated steel enclousure | 2016 | Completed |
PETROTRIN | Electrical Installation | Electrical Installation for GE Water System | 2016 | Completed |
POWERGEN | Installation of Power Supply | Supply & Installation of Power Suuply Cable for Camera System | 2016 | Completed |
MINISTRY OF SPORT | Electrical Upgrade - South-West Regional Indoor Sports Arena | Removal of existing Lights & replaced with new electronic type in Washroom/Change Room areas, Stor Room, | 2015 | Completed |
UNILEVER | Electrical Upgrade | Upgrade Electrical Work on Male Locker Area, Female Toilet & Corridor Area | 2015 | Completed |
UNILEVER | Electrical Works | Material & Labour for Booth Washier Facility | 2015 | Completed |
PETROTRIN | Electrical Work | Control Cable Installation from SWSH to SWPH | 2014 | Completed |
PETROTRIN | Electrical Work | CCR 6.6kv Power Station A- Substation Load Transfer | 2013 | Completed |
PETROTRIN | Electrical Work | Replacement of MCC #19 Pump House | 2013 | Completed |
PETROTRIN | Electrical Work | Installation of Switchgear, Transformer, 6.6KV & 15KV Cable Testing Certificates & Commissioning - #15 Cooling Tower Upgrade | 2013 | Completed |
ARCELOR MITTAL | Electrical Work | Installation of app. 300 feet Fixture - Port Cantilever Lighting Contract | 2012 | Completed |
ARCELOR MITTAL | Electrical Work | Installation of app. 300 feet Fixture - Conveyer Lighting & Power Installation Contract | 2012 | Completed |
POWERGEN | Electrical Work | Installation of Ring Main Unit & HV Power Cables & Controls / Termination | 2012 | Completed |
PETROTRIN | Port Lighting | Complete Lighting of Port | 2009 | Completed |
PROMAN | New Construction t | AUM Projec | 2008 - 2009 | Completed |
PROMAN | Electrical Installation & Testing | Methanol Project | 2008 | Completed |
PROMAN | New Construction | M5000 Methanol Plant Electrical Installation | 2004 - 2005 | Completed |
PROMAN | New Construction | M5000 Methanol Plant Electrical Installation | 2004 - 2005 | Completed |
PROMAN | New Construction | M5000 Methanol Plant E&I Installation | 2005 - 2005 | Completed |
PROMAN | New Construction | N2000 Ammonia Plant Electrical Contract | Completed | |
ARCELOR MITTAL | Rewiring Burnt Plant | Completed 33kv Rewiring/Termination & Testing of Furnace Supply & Distribudtion After Fire | 2004 | Completed |
PROMAN | New Construction | N2000 Ammonia Plant Electrical Contract | 2001 | Completed |
DOC'S ENGINEERING | New Construction | Emerald Plaza Electrical Erection | 2001 | Completed |
PROMAN | New Construction | CNC Ammonia Electrical Contract | 2000 - 2001 | Completed |
ARCELOR MITTAL | Rewiring Burnt Plant | Rewiring the Melt Shop Furnace | 1998 | Completed |
ARCELOR MITTAL | Rewiring Burnt Plant | Rewiring the Melt Shop Furnace | 1998 | Completed |
ARCELOR MITTAL | New Construction | LRF II E&I Contract | 1997 | Completed |
MOTOR / GENERATOR SERVICES
CLIENT | PROJECT DESCRIPTION | PROJECT TYPE | YEAR | STATUS |
DESALCOTT | Motor Services | Service (3) 600HP Wet Well Motor, under-cut and rebuild Drive-end Shaft, Balance Rotor, Remove and replace damage wedge and seal coil, | 2017 | Completed |
TOUCHSTONE EXPLORATION | Motor Services | Rewind (4) Motors (varoius sizes): Re-sleeve End Shield, Rebuild & Machine End Sheild, Supply and change Bearing | 2017 | Completed |
DELTA LOGISTC | Generator Services (On-Board) | Serivc (2) 45KW Generator Ends aboard Vessle | 2017 | Completed |
ATLANTIC LNG | Motor Services | (9) Motors (various sizes) Service and Balance Rotor | 2017 | Completed |
LEASE OPERATORS | Motor Services | Rewind, Service and Machine (3) Motors | 2017 | Completed |
IPSL (M5) | Motor Services | Contract to Service (26) Motors (various sizes):Change Bearing, Balance Rotor , Supply & Install Fan & Gearse Nipple | 2016 | Completed |
ATLANTIC LNG | Rewind (5) 40HP Stators | 2016 | Completed | |
MASSY WOODGROUP | Motor Services | Rewind a 350HP Motor | 2016 | Completed |
LEASE OPERATORS | Motor Services | Rewind and Service (4) Motors | 2016 | Completed |
PETROTRIN | Motor Services | Rewinding a Stator for Motor (M-2079) | 2014 | Completed |
REPSOL | Motor Services | Motor Rewinding (Contract) | 2010 | Completed |